imdmyself.com landscape design in harmony with nature

Entrance to the site - modern solutions for arranging the entrance. 95 photos of the entrance and the platform for the car

Many owners of private country houses face one very difficult task: this is a gutter at the entrance to their site and how to make an entrance to the site through the ditch. As a rule, most owners of private houses would solve this question very primitively, it is just to fill a small part of the ditch with sand or gravel, but this is not the way out in this situation. This raises the reasonable question of how to find the optimal solution in this case.

It should be noted that entry into your territory must be reliable, and meet all requirements. However, of great importance must be given to the strength and reliability of the site itself, which must withstand heavy loads from the weight of the car, and there must also be a normal drain for wastewater, this is very important.

Therefore, a solution to this issue can be found in this article, which also has a diverse and colorful photo of the entrance to the site.

Narrow Width Installation

This method of solving this problem of arrival at the summer cottage is considered quite simple, but the cost of the material to complete this task will be very high. Therefore, this option does not fit for large obstacles, especially if it concerns obstacles with wide openings.


Entrance to the site - modern arrangement solutions

Entrance to the site - modern arrangement solutions

Entrance to the site - modern arrangement solutions


Watch the video: Ennoble the entrance to the site

In this case, it is necessary to use concrete slabs of large dimensions, while the cost of the slab depends on its size. And these can be very significant figures.

So, how to arrange entry to the site? At the initial stage, it is necessary to determine what soil is located on the extreme sections of the channel, as they need to be strengthened as necessary. If this is not done, then from the mass of the car and the stove itself, it can sag or simply fall apart.

Next, you need to build additional reinforcement. Near concrete supports, it is necessary to make the formwork, in which there should be a reinforced double structure, after which concrete can be poured into the formwork. And the resulting free space between the supports and walls is recommended to sprinkle with sand or clay.

If the material intended for the channel has a large width and thickness, in this case it is recommended to dig the soil through the thickness of the plate.

At the final stage, the finished site is well leveled, as well as carefully tamped. In this case, the sand layer should be no more than 7 cm, similarly, a layer of gravel. Stacking is done by special construction equipment.

It should be noted that making access to the site through the ditch without resorting to the services of special equipment, and even independently it is practically not realistic.

Further, using the technique, it is necessary to lay the slab on the finished site, while the ratio of the height of the slab to the ground is important. So if there is a lot of soil, then it needs to be removed, but if it is not enough, you will have to add it.

Installation of a wide platform with sides

This method of mounting a check-in on your territory through a ditch is not expensive, but the implementation process is very time-consuming and lengthy. Its greatest difficulty is due to the fact that sewage can flow through the ditch.


So, if there is water in the dug hole, it must be pumped out immediately. However, many do not do this at all, and in vain. The fact is that if you mount the formwork in water, where concrete will then be poured, this will affect the quality of the structure. In this case, it is likely that the structure can simply collapse very quickly.

Next, it is necessary to install dividing walls at a small distance between each other. As a partition, you can use slate, wood or other building materials. Then you can start pumping water in each individual area.

After that, pour a small layer of sand into the prepared canal over the entire surface, and then an abundant layer of gravel and all this is recommended to be well compacted with a vibrating plate.

In the finished channel, you can lay a special pipe for water drainage, while it must be fixed in one position, using an ordinary brick. Further, on both sides at the edge of the pipe, it is necessary to mount a formwork having a height slightly greater than the channel walls.

The formwork must be in the formwork, and only then can concrete mortar be poured into the finished formwork. After pouring concrete, you must wait until the structure is completely dry.

Then it is necessary to strew the pipe with gravel in several layers, while each subsequent layer of gravel should have a fraction of less and less, we should not forget that each layer of gravel must be well compacted.


On a pre-prepared site, you can pour a thin layer of granite chips and compacted again, and in the end it is necessary to sprinkle with a small layer of sand. And at the end of the finished site, you can impose small stones or broken bricks in a height of not more than 5 cm, after which a special mesh connected from reinforcement is laid on this surface.

On the edges and around the perimeter mounted small road borders. And only after that the site can be poured with concrete mortar, in a height of not more than 7-8 cm.

For a preliminary calculation of the material, measurements of the height and width of the channel are required. If necessary, you can make the ditch deeper, while keeping in mind that the recess should be smooth and with a slight angle. This is necessary for a good water flow, if this is not observed, then the water will not drain and will stand in one place.

Therefore, to make a good check into your territory is not as easy as it might seem at first glance. Performing this work, one may encounter various difficulties that require some effort.


At the same time, you need to understand that you need to adhere to a clear plan of action, otherwise the final result will be very poor, if you are not confident in your abilities, then in this case you need to turn to specialists who have special equipment for such work. Therefore, it is practically impossible to make an entry to the site yourself.

If you have any difficulties or doubts, you can order a turnkey entry to the plot, and you will save a lot of your time and effort. However, in this case it will require certain financial costs, but these costs are worth it. In this case, the wizard will fulfill all your requirements and wishes.

Photo of entrance to the site

Entrance to the site - modern arrangement solutions

Entrance to the site - modern arrangement solutions

Entrance to the site - modern arrangement solutions

Entrance to the site - modern arrangement solutions

Entrance to the site - modern arrangement solutions

Entrance to the site - modern arrangement solutions

Entrance to the site - modern arrangement solutions







Design of a plot of 10 acres: examples of the implementation of design ideas (85 photos)

Flowers

Brick grill - 110 photos of the best options for a summer residence. Instructions on how to do it yourself.

Weather vane: modern looks and stylish design ideas (65 photo ideas)


Join the discussion:

2 Comment Chain
0 Chain Answers
0 Followers
 
Most popular comment
Topical Comment Chain
2 Comment authors
Subscribe
Notification of
Svetlana

There are many solutions for stylish design, but I think that in any case it’s worth putting a pipe in the gutter so that the water does not stagnate in one place. I would prefer closed gates, as this provides reliable protection from prying eyes, and in front of them is a spacious platform for possible guests in cars. Now all materials are on sale to translate the idea into reality.

Milan

It is very important to make a spacious entry for the car. And it is desirable that it fits a little, because when friends or relatives arrive, there will be a problem - where to put the car. Some photos in the article are simply gorgeous, for such an entry / turn there is definitely not 6 hundred parts needed))) In general, the very problem of entry and parking is the problem of the site itself, which is often small and not up to the frills.